Striping

HOA Parking Lot Striping Guide for Tigard and Tualatin, Oregon

Cojo
March 21, 2026
6 min read

HOA Parking Lot Striping in Tigard and Tualatin

Tigard and Tualatin sit in the heart of Portland's southwestern suburbs, with a dense concentration of HOA communities built from the 1980s through today. From established condo complexes along Highway 99W to newer developments near Bridgeport Village and the Tigard Triangle, these communities manage significant shared parking infrastructure that requires regular parking lot striping to stay safe and compliant.

Suburban Portland HOA Parking Challenges

Tigard and Tualatin HOAs face a distinct set of parking lot challenges:

  • High-density developments with limited visitor parking create heavy stall utilization
  • Commuter traffic — proximity to I-5 and Highway 217 means many residents leave vehicles in lots during work hours
  • Retail adjacency — communities near Bridgeport Village, Washington Square, and the Tigard Triangle deal with overflow parking from shoppers
  • Aging infrastructure — 1980s and 1990s communities have parking lots approaching or past their initial design life
  • Mixed-use transitions — the Tigard Triangle redevelopment is changing parking needs for neighboring HOAs

Regular striping addresses safety and compliance. Neglected lots with faded lines increase accident risk, ADA liability, and fire code violation exposure.

Tigard-Tualatin HOA Striping Costs

Community SizeParking ScopeCost Range
24-unit townhomeSurface lot, 15-24 spaces$800-$2,000
60-unit condo complexMedium lot with visitor section$2,500-$5,500
100-unit communityMultiple lots, 70-100 spaces$5,500-$13,000
200+ unit developmentLarge lots + private roads$11,000-$26,000
Pricing is consistent with Portland metro rates. See our parking lot striping cost guide for Oregon for detailed breakdowns by scope and complexity.

ADA Compliance

Every Tigard and Tualatin HOA parking lot must meet ADA standards. Key requirements include:

  • Accessible space count proportional to total lot capacity
  • Van-accessible spaces with 8-foot access aisles — minimum one per six accessible spaces
  • International Symbol of Accessibility on pavement and vertical signage
  • Diagonal hatching in access aisles
  • Accessible route to building entrances maintained and marked

Non-compliance exposes the HOA to complaints, ADA lawsuits, and potential fines. Restriping every 2 to 3 years is the simplest way to maintain compliance. See Oregon striping regulations for the complete framework.

Coordinating Striping with Sealcoating

Tigard-Tualatin HOAs that include sealcoating in their maintenance cycle must restripe after every application. Bundling both services reduces total cost and minimizes resident displacement.

See HOA sealcoating in Tigard and Tualatin and our sealcoating and striping package for coordination guidance.

Scheduling for Tigard-Tualatin Communities

The striping season follows Portland metro timing — June through mid-September, with July and August as the most reliable months.

  • Book by May for July-August scheduling
  • Commuter patterns — most Tigard-Tualatin residents work standard weekday hours. Schedule striping between 8 a.m. and 3 p.m. when lots are partially empty
  • Mid-week scheduling (Tuesday through Thursday) works best for resident convenience
  • WES commuter rail — communities near the WES stations (Tigard Transit Center, Tualatin) have residents who take transit to work, leaving fewer vehicles in lots during weekdays
  • Phase projects across 2 to 3 days for communities with limited alternate parking
  • Avoid summer Saturdays — retail traffic near Bridgeport Village and Washington Square increases weekend parking demand in adjacent HOA lots

Older Community Considerations

Many Tigard and Tualatin HOAs were built in the 1980s and 1990s. Their parking lots have specific characteristics:

  • Narrower stalls — older lots may have 8.5-foot stalls versus the current 9-foot standard. Restriping is an opportunity to evaluate stall width
  • Faded layout — original parking layouts may not reflect current ADA requirements. Update during restriping
  • Pavement condition — 30 to 40-year-old asphalt may need patching or overlay before new striping is cost-effective
  • Drainage issues — older lots may have settled, creating puddles that undermine striping durability. Address drainage before painting

Discuss lot condition with your contractor during the bid process. Surface preparation is critical for long-lasting results.

Resident Communication

Tigard and Tualatin HOAs typically serve working families with predictable schedules:

60 days before: Board approval and community notice. Include project rationale and budget source.

30 days before: Detailed schedule with parking map and alternate parking locations. Distribute via email, community website, and physical posting.

14 days before: Reminder with vehicle removal policy and towing provisions.

48 hours before: Door hangers and physical signage in work zones with specific times.

Day of: Cones, barrier tape, and on-site board or management representative.

Evaluating Contractor Bids

HOA boards should request at least three bids. Evaluate:

  • Oregon CCB license — required for projects over $1,000
  • Liability insurance — $1 million minimum
  • ADA competence — contractor should reference current accessibility standards
  • Phasing plan — detailed approach for maintaining resident parking during work
  • Material quality — commercial-grade traffic paint, proper mil thickness
  • Portland metro HOA references — three community project references
  • Weather contingency — no-charge rain rescheduling clause

Frequently Asked Questions

How much does HOA striping cost in Tigard or Tualatin?

Costs range from $800 for a small townhome community to $26,000 for a large 200-plus-unit development. Most mid-sized communities spend $3,000 to $7,000 per restriping cycle.

How often should a Tigard-Tualatin HOA restripe?

Every 2 to 3 years. Portland metro weather creates a consistent degradation cycle. High-traffic lots may benefit from biennial striping.

Can older parking lots be restriped, or do they need repaving first?

If the surface is intact with only cosmetic wear, restriping is appropriate. If there is significant cracking, potholes, or base failure, patching or overlay should happen first. Your contractor should assess the surface during the bid visit.

When is the best time to schedule HOA striping in Tigard or Tualatin?

July and August are most reliable. Book by May. Mid-week scheduling between 8 a.m. and 3 p.m. takes advantage of commuter patterns that leave lots partially empty.

Should we update our parking layout during restriping?

If your community was built before 2000, yes. Older lots may not meet current ADA requirements or reflect modern stall width standards. Restriping is the most cost-effective time to update the layout.

Get Your Tigard-Tualatin HOA Striping Quote

Regular striping maintenance protects your community's safety, compliance, and property values. Start planning early and invest in professional workmanship.

Contact Cojo for a free HOA striping estimate — we serve Tigard, Tualatin, and surrounding communities with professional striping, ADA compliance, and lot maintenance coordination.

Related Articles

striping

ADA Parking Lot Striping: Dimensions, Colors & Layout Requirements

Complete guide to ADA parking lot striping dimensions, paint colors, access aisle markings, and layout requirements for Oregon commercial properties. Includes van accessible specifications.

CO
Cojo
Mar 19, 2026
9 min
striping

ADA Striping Requirements in Oregon (2026): Complete Compliance Guide

Current ADA parking lot striping requirements for Oregon in 2026. Space counts, dimensions, access aisles, signage, and marking specifications for full compliance.

CO
Cojo
Mar 21, 2026
6 min
striping

ADA Van-Accessible Parking Spaces in Oregon: Requirements and Striping Specifications

Learn the specific requirements for van-accessible parking spaces in Oregon — wider aisles, vertical clearance, signage, and proper striping for full ADA compliance.

CO
Cojo
Mar 21, 2026
6 min

Ready to Start Your Project?

Get a free estimate for your paving, concrete, or excavation project today.