Line Striping & Pavement Markings
Clear Lines. Safe Lots. Professional Results.
Professional parking lot striping and pavement marking services including ADA compliant handicap stalls, fire lanes, directional arrows, and custom markings.
Why Choose Us
The Cojo Difference
ADA Compliance
Proper sizing and markings meet current accessibility requirements
Commercial-Grade Paint
Traffic-rated paint provides long-lasting visibility
Precision Equipment
Professional striping machines ensure straight, consistent lines
Maximized Capacity
Optimal stall layout provides maximum parking capacity
Quick Dry Time
Fast-drying paint minimizes business disruption
Safety Improvement
Clear markings improve traffic flow and reduce accidents
Overview
Line Striping & Pavement Markings Services
Professional Line Striping Services in Oregon
Clear, crisp pavement markings are essential for safe, organized parking lots. Cojo Excavation & Asphalt provides professional line striping services throughout Oregon using commercial-grade traffic paint and precision equipment.
### Our Striping Services
- Parking stall lines
- Driving lane markings
- Stop bars and crosswalks
- Directional arrows
- No parking zones
- Handicap accessible stalls (proper sizing: 8' stall + 5' access aisle)
- Van accessible spaces (8' stall + 8' access aisle)
- International Symbol of Accessibility (ISA)
- Access aisle hatching
- Accessible route markings
- Fire lane curb painting
- Loading zone designation
- Reserved parking stalls
- Speed bumps and stop signs
- Custom stencils and logos
### Why Professional Striping Matters
**Safety**: Clear markings guide traffic flow and prevent accidents **Efficiency**: Maximized parking capacity with properly sized stalls **Compliance**: Meet ADA and fire code requirements **Professional Image**: Fresh striping enhances curb appeal
### ADA Compliance Requirements
Oregon businesses must provide accessible parking meeting current ADA standards:
| Total Spaces | Required Accessible | Van Accessible | |-------------|---------------------|----------------| | 1-25 | 1 | 1 of the total | | 26-50 | 2 | 1 of the total | | 51-75 | 3 | 1 of the total | | 76-100 | 4 | 1 of the total | | 101-150 | 5 | 1 of the total |
**Note**: At least one of every six accessible spaces (or fraction of six) must be van accessible.
### Our Striping Process
1. **Surface Preparation**: Clean all debris from striping areas 2. **Layout**: Measure and chalk lines for optimal stall sizing 3. **Application**: Apply commercial traffic paint with professional striping machine 4. **Detail Work**: Hand-paint edges, stencils, and specialty markings 5. **Dry Time**: Allow 30-60 minutes drying before traffic
### Service Area
We provide line striping services throughout the Oregon I-5 corridor including Eugene, Salem, Portland, and surrounding communities.
**Contact us at (541) 409-9848** for a free striping estimate. CCB #241656.
Our Process
How We Work
Layout Planning
Measure lot and plan optimal stall layout for maximum capacity
Surface Cleaning
Remove debris and ensure clean surface for paint adhesion
Line Layout
Chalk reference lines for straight, properly-spaced striping
Machine Striping
Apply traffic paint with professional striping equipment
Stencil Work
Hand-apply handicap symbols, arrows, and specialty markings
Final Inspection
Verify measurements, ADA compliance, and paint quality
FAQ
Common Questions
Ready to get started?
Get a free, no-obligation quote for your line striping & pavement markings project. We respond within 24 hours.