Riverside Park Multi-Use Trail
MunicipalSmall Business Project

Riverside Park Multi-Use Trail

Paved Recreation Trail System

Riverside Park, Silverton, OR36,000 sq ft30 daysMay 2025
5-Year Warranty
On all installations
Licensed & Bonded
CCB #123456
$2M Insured
Full liability coverage
4.9★ Rating
127+ reviews
The Project

What We Delivered

New multi-use paved trail system connecting park amenities with ADA-accessible paths, exercise stations, and scenic overlooks.

Transformation

See the Difference

Paved multi-use trail
Gravel paths through park
Before
After

Drag the slider to compare before and after

Trail bridge over creek
Scenic overlook patio
The Story

How We Made It Happen

1

The Challenge

Creating a smooth, accessible trail system through varied terrain while preserving natural features and minimizing environmental impact.

2

Our Solution

We used low-impact construction methods, designed paths to follow natural contours, and installed permeable paving in sensitive areas near the creek.

3

The Results

1.5 miles of accessible trails
Connected all park amenities
8 exercise station pads
3 scenic overlook areas
Free Consultation

Planning a Similar Project?

Get expert advice and a detailed quote tailored to your property. No obligation, no pressure.

Response within 24 hours

Technical Specifications

Trail Length1.5 miles
Trail Width10 feet
SurfaceAsphalt & permeable
Exercise Pads8 stations

Project Scale

Small Business Project

Ideal for local businesses

We handle projects of all sizes

Services Included

trailparkrecreationaccessible

Prefer to call?

(541) 409-9848
Start Your Project

Your Property Deserves
Professional Results

Join dozens of businesses across Oregon who trust Cojo for quality excavation and asphalt. Your free consultation is just a click away.

5-Year WarrantyLicensed & Bonded4.9★ Average Rating