A well-built asphalt speed hump runs 7 to 10 years on a parking lot, and 5 to 7 on a residential street, before it needs more than a paint refresh. A rubber hump bolted to asphalt usually goes 5 to 8 years before bolts loosen or rubber sections fatigue. Maintenance is what decides whether you hit the top of those ranges or replace it early. Below: our annual inspection checklist, the repair triggers that buy more service life, and where the replace-versus-repair line falls.
The four maintenance categories are paint and reflectivity, structural integrity, hardware (rubber humps), and signage. The Federal Highway Administration's Traffic Calming ePrimer treats all four as part of the calming-device lifecycle, not optional add-ons.
Cojo's standard cadence:
Use this as the field card. A property manager or maintenance lead can run it in under 10 minutes per hump.
| Item | Pass criteria | Action if fail |
|---|---|---|
| Yellow chevron paint visible | Reflective at 100ft at night | Re-paint within 30 days |
| Edge cracking | None longer than 12 inches | Crack-fill |
| Surface raveling (loose aggregate) | None | Schedule slurry seal or fog seal |
| Profile height | 3 to 4 inches at crown | Re-pave or replace if below 2.5 inches |
| Patch boundary | No water ponding | Re-grade or re-patch |
| Reflective markers | All present, lit by headlights | Replace missing or dim units |
| MUTCD W17-1 warning sign | Legible at 100ft, post plumb | Re-sheet or straighten post |
| Advance pavement marking (HUMP text) | Visible from approach | Re-paint with thermoplastic |
| Rubber hump bolts | Torque to 30 to 40 ft-lbs | Re-torque or replace anchors |
| Rubber hump section seams | No vertical lift between sections | Re-anchor or replace section |
The annual pass extends the quarterly checklist with measurement and documentation.
Place a 10-foot straightedge across the hump perpendicular to traffic. Measure peak height with a tape. Compare against the original install spec (typically 3 to 4 inches per ITE Traffic Calming Manual recommendations). If the hump has lost more than half an inch of crown, the calming effect drops measurably -- replacement is more cost-effective than chasing partial repaves.
Photograph the hump from both approaches and from above (a phone on a selfie stick works). Date-stamp the photos. After 3 years of annuals you have a degradation timeline that justifies the replacement budget request.
Log every crack longer than 6 inches by location. Cracks under a quarter inch wide can be sealed with hot-pour rubberized sealant. Cracks wider than half an inch are structural and indicate base-course failure -- those need a saw-cut and patch, not just sealant. The FHWA Crack Sealing Manual is the reference Cojo crews work from.
Cojo's repair call log breaks roughly 70/20/10:
Re-paint when reflectivity drops below 100 mcd/m^2/lux as measured by a retroreflectometer, or when night-time visibility from 100 feet is no longer obvious. Cojo crews refresh the yellow-and-black chevron pattern every 18 to 24 months on water-based traffic paint, or every 4 to 5 years on thermoplastic. Thermoplastic is the better long-term spend even though the upfront cost is 2.5 times higher.
Cracks under a quarter inch wide get a hot-pour rubberized sealant, applied with a melt-and-pour pot. Cracks wider than half an inch get a saw-cut, partial mill, and hot-mix patch -- the same process as the removal patch step but limited to the failed area. The Oregon DOT Section 00744 tack-coat and patch spec applies.
Replace when any of the following are true:
| Material | Typical lifespan (parking lot) | Typical lifespan (residential street) |
|---|---|---|
| Asphalt speed hump | 7 to 10 years | 5 to 7 years |
| Rubber speed hump (modular) | 5 to 8 years | 4 to 6 years |
| Plastic speed hump | 3 to 5 years | 2 to 4 years |
| Concrete speed hump (cast-in-place) | 12 to 20 years | 10 to 15 years |
Industry Baseline Range
| Maintenance task | Range |
|---|---|
| Annual inspection (per site, up to 5 humps) | $200 to $500+ |
| Re-paint chevrons (water-based, per hump) | $80 to $180+ |
| Re-paint chevrons (thermoplastic, per hump) | $250 to $500+ |
| Crack-fill (per linear foot of crack) | $4 to $9+ |
| Edge patch (small, single hump) | $400 to $1,200+ |
| Bolt re-torque (rubber hump, per unit) | $80 to $150+ |
| Reflective marker replacement (per marker) | $25 to $60+ |
| Warning sign re-sheet (MUTCD W17-1) | $120 to $250+ |
| Full hump replacement | $2,000 to $5,000+ |
Oregon's 2026 traffic-paint and labor pricing has pushed re-paint costs about 12 to 18 percent above the 2024 baseline. Multi-hump bundling on the same site typically drops the per-hump price by 25 to 35 percent because mobilization is amortized.
In April 2026 Cojo inspected an apartment complex in South Salem with 6 asphalt humps installed in 2019. The annual pass found 4 humps with worn chevrons, 2 humps with edge cracking, and 1 hump with a 1.5-inch crown loss (down from 3 inches at install). The crew re-painted all 6 with thermoplastic, sealed 38 linear feet of cracking, and replaced the 1 failing hump in a single 2-day mobilization. Total cost was significantly lower than the budget the owner had set aside for full replacement of all 6.
The cheapest hump is the one that lasts 10 years instead of 5. A $400 annual inspection and a $200 re-paint every 2 years protects a $3,000 install -- a 10x return on the maintenance dollar. Cojo offers an annual maintenance contract for property managers that bundles inspections, paint refreshes, and crack-fill into a single line item. See asphalt maintenance services for the full scope, or browse the speed hump installation in Salem page for local maintenance and replacement examples.
A practical guide to sealcoating apartment and condo parking lots. Covers phased scheduling, tenant communication, cost allocation, liability, and ROI for property value.
Get accurate 2026 asphalt paving costs for Oregon driveways, parking lots, and roads. Per-square-foot pricing, cost factors, and money-saving tips.
Compare asphalt and concrete driveways side by side: cost, durability, maintenance, appearance, and climate performance for Oregon homes.
Have a question about this topic? We'll respond within 24 hours.