Parking Lot
ADA Parking Striping in North Bend, Oregon: Bringing Your Lot Up to Code
Cojo
May 30, 2026
7 min read
A restripe is the cleanest chance a property owner gets to bring a lot into ADA compliance. When the old lines have faded out, the lot is effectively a blank slate — and that is the moment to confirm your accessible spaces actually meet the 2010 ADA Standards for Accessible Design and Oregon's ORS 447.233, rather than simply repainting an old and possibly non-compliant layout.
North Bend property owners restripe more often than most of inland Oregon, and the reason is the bay. Salt air off the Pacific and Coos Bay fades traffic paint and works against adhesion, and the area's heavy rainfall keeps surfaces damp deep into the striping season. Lots along Sherman Avenue, the Highway 101 frontage, and the bayfront see markings wear faster than comparable inland lots. Each restripe is therefore a recurring opportunity to get the accessible layout right.
This guide covers what a compliant restripe involves. For the statewide framework, start with our ADA parking compliance guide for Oregon.
Bringing a lot up to code through striping comes down to four things: count, dimensions, aisle marking, and signage.
The 2010 Standards require a minimum number of accessible spaces based on total capacity — about one per 25 at smaller sizes (1 for 1 to 25 total, 2 for 26 to 50, 3 for 51 to 75, 4 for 76 to 100), rising from there. A restripe is the right time to recount, because older North Bend lots were often striped before current ratios applied and come up short.
At least one in every six accessible spaces, rounded up, must be van-accessible. Even a small lot with a single accessible space needs that space to be van-accessible. Van spaces need an 8-foot space with an 8-foot aisle, or an 11-foot space with a 5-foot aisle.
Standard accessible spaces are at least 8 feet wide with an adjacent 5-foot access aisle. The full layout must be measured and chalked before paint. Our 2026 ADA striping requirements guide details each dimension.
Each aisle must be striped, usually with diagonal hatching and "NO PARKING" lettering, and may be shared between two adjacent accessible spaces. The full specification is in our ADA access aisle striping spec.
In North Bend, the paint decision drives how long your compliant layout stays compliant. Standard water-based latex paint that lasts 18 to 24 months inland often fades to a citable level in 12 to 18 months in salt-air conditions. Because faded accessible symbols and aisle markings can themselves be cited, durability directly protects compliance.
For the accessible portions specifically — the blue space borders, the International Symbol of Accessibility, and the aisle hatching — more durable oil-based traffic paint or thermoplastic is worth the higher up-front cost. These hold color and contrast far longer in bay conditions. Reflective glass beads improve visibility during North Bend's long, wet winters and add safety for everyone using accessible spaces at night.
Timing matters too. Striping needs dry pavement above 50°F, and the reliable dry window on the bay is narrow. Booking ahead for mid-summer through early fall is the difference between a clean cure and a weather-delayed job.
A restripe temporarily clears the layout, which is the right moment to fix problems that are expensive to correct on a fully striped lot:
Slope is the one item paint cannot fix. If an accessible space has settled — a real risk on North Bend's low-lying, fill-supported lots — regrading is required, and a professional layout flags it before paint goes down.
Striping and signage go together. Each accessible space needs a sign with the International Symbol of Accessibility mounted at least 60 inches above grade to the bottom of the sign, a "Van Accessible" plate where required, and Oregon's fine-amount plate. A restripe that refreshes ground markings but leaves signs faded, too low, or missing the Oregon fine plate is only half compliant.
The accessible portion of your lot carries the most liability, so it is the part most worth getting right. Cojo Excavation & Asphalt restripes North Bend and Coos County lots to current ADA layout standards — measuring, verifying counts and dimensions, and applying durable paint built for bay conditions.
These standards are general guidance; a site-specific review confirms your exact obligations and is something we recommend before any restripe. See our professional striping services, compare local pricing in our parking lot striping in North Bend guide, or request a free quote — we respond within 24 hours.
Understand what happens during an ADA parking compliance audit, common violations found in Oregon commercial lots, and how to prepare your property.
Complete guide to ADA parking requirements in Oregon, including space dimensions, van accessible standards, signage rules, and ORS 447.233 specifics for commercial property owners.
See real before-and-after results of commercial sealcoating projects in Oregon and learn how this affordable maintenance extends parking lot life by a decade or more.
Have a question about this topic? We'll respond within 24 hours.