ADA Parking Compliance Audit in Keizer, Oregon: What to Expect
Cojo
May 30, 2026
7 min read
Keizer sits just north of Salem in Marion County, and its commercial lots carry steady volume for the city's size — the retail along River Road and Cherry Avenue, the big-box anchors at Keizer Station, and the traffic around Volcanoes Stadium and the Chemawa Road offices. High-visibility, high-turnover lots are the ones that draw accessibility complaints, and Oregon makes such complaints cheap and easy to file.
An ADA parking compliance audit is a structured, measured review of your lot against the 2010 ADA Standards for Accessible Design and Oregon's accessible-parking law, ORS 447.233. It identifies where your lot falls short before a demand letter or a repaving permit forces the issue — and in the wet mid-valley, faded markings are one of the most common findings. This guide explains what a Keizer audit covers, how it runs, and what to do with the report. The statewide rules behind every finding are in our ADA parking compliance guide for Oregon.
A real audit touches every element the federal standards and ORS 447.233 regulate. Here is the checklist an inspector runs in a Marion County lot.
The auditor counts total stalls and checks the accessible count against the federal table — one accessible space per 25 stalls, two for 26 to 50, three for 51 to 75, and up. At least one in six accessible spaces (rounded up) must be van-accessible. The larger Keizer Station lots fall into upper rows where the van count steps up, and undercounted van stalls is a frequent finding there. Medical lots carry heavier ratios: 10 percent of stalls accessible for outpatient clinics, 20 percent for rehabilitation facilities.
Accessible stalls must be at least 8 feet wide. Standard stalls pair with a 5-foot access aisle; van stalls need an 8-foot aisle (or the 11-foot-stall alternative). The auditor measures widths, confirms diagonal hatching and the NO PARKING legend in each aisle, and checks that two stalls aren't sharing one undersized aisle.
Accessible stalls and aisles cannot exceed 2 percent slope in any direction. Keizer lots near the Willamette floodplain, where soils settle, often drift past tolerance as the base moves over the years. The inspector reads slope with a digital level at multiple points; a visual estimate does not hold up.
Each accessible stall needs a vertical sign with the International Symbol of Accessibility mounted at least 60 inches from the ground to the bottom of the sign. Van stalls add a "Van Accessible" plate, and Oregon requires a supplemental sign stating the fine for unauthorized parking — a requirement national chains at Keizer Station frequently miss.
The path from the accessible stalls to the entrance must be continuous, slip-resistant, and free of abrupt level changes greater than a quarter inch. Cracks over half an inch, potholes, and standing water along the route are flagged — and in the rainy valley, drainage-related ponding is a recurring finding.
A typical engagement runs in four stages; our detailed walkthrough of how an ADA compliance audit works covers each, and here is the Keizer version.
To pre-screen your own lot, run it against our common ADA parking violations checklist before the auditor arrives.
Across Marion County, a few findings repeat. Faded accessible symbols and aisle hatching lead the list — the wet mid-valley climate and steady UV wear blue traffic paint within a couple of years, faster still on the high-turnover River Road and Keizer Station lots, and a symbol you can barely read counts as missing. Signs mounted below 60 inches or missing the Oregon fine plate come next, followed by undercounted van stalls at the larger centers, undersized access aisles, slope creep, and drainage ponding. None are exotic, and most are correctable in a single restriping and signage visit.
The lesson is to audit early and act. A demand letter or a repaving permit that triggers the alterations rule turns a few hundred dollars of restriping into a much larger project on someone else's timeline.
Once you have the findings, the fix is usually striping and signage work, sometimes with minor surface repair for slope or drainage. Cojo Excavation & Asphalt handles ADA restriping, symbol stenciling, sign installation, and the asphalt repairs that bring slopes and surfaces back into tolerance for Keizer and Marion County owners. For general line work, see our parking lot striping in Keizer page and our professional striping services.
The figures here are general guidance under the 2010 ADA Standards and ORS 447.233; only a site-specific survey confirms what your lot needs. Request a free quote and we will assess your Keizer lot and map the path to compliance.
Understand what happens during an ADA parking compliance audit, common violations found in Oregon commercial lots, and how to prepare your property.
Complete guide to ADA parking requirements in Oregon, including space dimensions, van accessible standards, signage rules, and ORS 447.233 specifics for commercial property owners.
See real before-and-after results of commercial sealcoating projects in Oregon and learn how this affordable maintenance extends parking lot life by a decade or more.
Have a question about this topic? We'll respond within 24 hours.